line
Building project
Support of a 5-storey house using a steel structure
Location
Munich - Schwabing
Description
Planning, production and assembly of support girders, designed to carry the entire load of the building. The assembly had to be closely coordinated with the disassembly of the walls to ensure the stability of the building