back to projects
Building project
Building of a flour production facility
Location
Höhr-Grenzhausen
Description
Assembly of the entire steel structure as well as planning, ordering and assembly of the facade and roof with windows, doors and adaptation work as needed
Im Martelacker 8
D-79588 Efringen-Kirchen
Fon: +49 (0) 7628 / 80 56 65
Fax: +49 (0) 7628 / 80 56 69
info@stahl-solutions.de
Manager
Rainer Hofmann
Dipl. Stahlbau-Ing. (FH)
Amtsgericht Freiburg im Br.
HRB 700901
Tax
11 089 12 847